Zipline XXL -Geilo (Norway)

Contracting authority:

Geilo Skisenter

Challenges:

Creation of a new leisure activity

Missions:  General Contractor

Specific works:

  • Zipline of 1200m
  • Slope 22.4%
  • Intermediate pylon with point of inflection
  • Deceleration arrival controlled by hydraulic brake
  • Maximum speed 90km/h
  • 1min30 of thrills
  • Technology¬†: Martello Teleferice

Completion date:

  • Study: 3 weeks
  • Preparation: 6 weeks
  • Assembly on site: 2 weeks by 3 technicians.